Fuel Moto USA Ebay
Need Help? Call or Email Us
920-423-3309
info@fuelmotousa.com
Mon-Fri 9-5pm CST
Largest Dynojet retail and tuning center


Note: You may need Adobe Acrobat® to read .pdf format downloads from this website. You can download a copy of Acrobat® Reader here.

Milwaukee Eight Cam Install Step by Step

In this article we will outline what is involved in a cam swap in the H-D Milwaukee Eight engine. This is a very straight forward procedure. We will be covering the complete step by step install using a bolt in replacement cam using quick install adjustable pushrods, in this example we will be re-using the stock lifters. The bike is a Road Glide with 107" M8 air cooled engine.

Here is the motor ready for disassembly, we've removed the complete exhaust system, air cleaner, and cam cover.

DSC_0257.JPG

 

In this application we will not be re-using the factory pushrods, we are using Quick Install style adjustable pushrods. THe image below shows cutting the factory pushrods with a bolt cutters and removing them. Do not use a cutoff wheel or grinder, use a bolt cutter which makes a clean cut and eliminates (or highly reduces) the chances of any particulates making their way into the motor.

DSC_0259.jpg

 

Remove the cam cover. Here is a close up image of the camchest. Next remove the cam chain tensioner, sprockets & chain, then completely remove the cam plate leaving the oil pump in place in the engine case. 

DSC_0279.jpg

 

camchest with cam plate removed

DSC_0262.jpg

 

Removal and installation of the the inner cam bearing using the appropriate cam bearing tools

DSC_0669.jpg

DSC_0670.jpg

 

 M8 cam plate removed from engine

DSC_0264.jpg

 

backside view of M8 cam plate with camshaft

DSC_0265.jpg

 

Cam sprockets & chain

DSC_0267.jpg

 

cam chain tensioner

DSC_0268.jpg

 

stock H-D M8 cam on the left, Wood Performance WM8-222 cam on the right. Note the lobes are pressed on the factory cam, the aftermarket cam is machined from a billet blank. 

DSC_0269.jpg

 

The lifter blocks and lifters do not need to removed. For holding the lifters to allow cam plate removal we use the same Twin Cam magnetic tools for holding the lifters in place on the M8, there are other simple ways to hold them as well including the binder clip method. NOTE: we recommend replacing & upgrading lifters at the same time as part of a complete cam swap.  

DSC_0272.jpg

 

Carefully clean & inspect the cam & cam plate, liberally apply assembly lube to the camshaft  

DSC_0271.jpg

 

Replace o-ring on feed oil port, install cam plate into the engine cases, install screws loosely

DSC_0273.jpg

 

Use rear wheel to roll engine over to ensure the oil pump does not bind. Tighten cam plate screws in sequence according to manual, do not final torque. Turn engine until the flat surface on the crankshaft is horizontal. Carefully torque cam plate bolts in steps as listed in service manual. Final torque on these bolts is 120 in-lb    

DSC_0274.jpg

 

Install cam sprockets & chain. Use red loctite on these fasteners. You can use the same locking tool as a Twin Cam. Double check sprocket alignment and cam spacing. Carefully torque cam sprocket bolt to 34 ft-lb, crankshaft sprocket to 25 ft-lb   

DSC_0275.jpg

 

Note cam timing marks. The dot on the upper sprocket will be at 6:00, the dot on the lower sprocket is at 12:00. Install tensioners, use blue loctite and final torque is 120 in-lb 

DSC_0279.jpg

 

Install pushrods and follow the full adjustment procedure. Adjust pushrods to spec based on the  thread pitch listed by the manufacturer and for the specific lifter you are using.

DSC_0278.jpg

 

Install cam cover, you are now ready to install the exhaust system and other components that were removed for cam installation

DSC_0256.jpg

 

 

 

For more info, data, and dyno sheets on Milwaukee Eight camshafts check our our M8 Dyno shootouts for the 107" and 114" engines!  

 

m8shootout.jpg

 

 

 

 

 

 

 

 

 

 

 

Have more questions? Submit a request